Register   
Login
    
    


Vertically Integrated Manufacturing

Our manufacturing facility was built to package large scale power generation equipment with over 8 acres of outdoor secure storage.

PPPI's 50' high and 70' wide bays allow us to pick and move even the largest enclosure packages and ensures your product will be handled in the safest and most feasible manner. Our buildings were built from the ground up to package large genset enclosures.

    click on photo to enlarge

Penn Plaza cogeneration system preassembly 
 
Control system passembly
 
Brake bending

Welding

Paint spray booth

Complex piping

Genset package assembly

Permanent resistive  load bank assembly
 
Penn Plaza module assembly

Large UL Tank fabrication

Heavy lift package insertion

Large volume storage

Sand blast facility

NC laser cutting system 

NC plasma cutter

Wall panel assembly

Production Facility
Our original 112,000 sq. ft. production facility was built in 2002 with a major additon of 24,000 sq. ft. added in 2009 which is equipped with two 50 ton bridge cranes. 

We are located in Darien WI, convenient to major highways. We have certified scales for accurate weight documentation, and rail car loading ability within our complex.

Custom Paint Spray Booth
PPPI's large capacity paint booth capable of painting most any unit.

Loading
Our crane systems are designed and engineered to provide safe and efficient loading and unloading capabilities with radio controlled hardware.

Welding Crane Bays
Certified welders per AWS
(2) 20 ton and (2) 50 ton bridge cranes

In House Fabrication
PPPI provides in house fabrication and metal stamping for total project delivery
control and quality

    
Contact Us for more information.

     
Copyright (c) 2010 Professional Power Products
*